Module 4 - Substations projects for year
2004/ 2005
- S0499_3:
Trial of TJH2b tapchanger diagnostics (TASA) - S4107_2
Headspace gas testing of oil filled switchgear Stage 2 - S4130
Stage 3: Appendix to above report - S4130
Stage 3: Assessment of dry wipe and solvent combinations for HV Oil Filled Equipment - S4130:
Wipe Assessment for HV Oil Filled Equipment Stages 1 &2 - S4138:
Improving Insulator Performance In HV Outdoor Substations - S4145:
Environmental Impact of Substations - S4146
Distributed Generation Key issues and considerations for the Distribution Network - S4147:
On-line oil treatment processes - S4149:
The quality, performance and longevity of current and recent substation equipment - S4150:
Review of Arc Suppression Coil Systems and their Application in the UK Distribution Network Rated up to 36kV - S4155:
Investigation of Ester Based Insulating Fluids - S4156:
Ideas from Cigre: Review of work Study Committee SCB3 and related work on Substations 2000-2004 - S4156:
Ideas from Cigre: Review of work Study Committee SCB3 and related work on Substations 2000-2004 - S4157:
Monitoring Cigre: Work of Study Committee SCB3 (Substations): 2004 - S4161:
Embedded Communications for Distribution Networks - S4162:
To extend the voltage range of non-intrusive partial discharge detection for use on switchgear operating above 90kV - S4166:
A Device for mapping earth electrodes within HV environment - S4172_1:
Scoping study into the refurbishment of large power transformers