Module 4 - Substations projects for year
2009/ 2010
- S4164_7:
OLTC Monitor: Modifications Based Upon Trial Experiences (09/10 - S4178_3
Extension of Trial of Impedance Testing of Substation Batteries - S4181_4
Ongoing programme of transformer post mortems - S4185_6
AM Forum 2009-10 - S4193_3
Switchgear Type Reference: Risk and Reliability (Draft) - S4203_2
Insucon Proceedings 2009 - S4234_2
Ferroresonance seminar information dissemination - S4236_2
Aquagen recombination system - S4238_2
Module 4 Information Dissemination - S4240_1
Protective Devices and Technologies for Sealed Distribution Transformers (Draft) - S4243_1
(Revised) Commissioning and testing procedures (Draft) - S4246_1:
X/R Performance of Oil Circuit Breakers - S4248_1:
Protection Testing and Maintenance Review. (09/10) (Draft) - S4249_1
Revision of the SF6 guidance document (Draft) - S4252_1:
Transformer OLTC Contact Wear Indication Techniques - S4253_1:
Plant Failures and Fire: The Release of Hazardous Emissions - S4254_1
Applied research and development of tap changer maintenance systems and services: Standards and Design Review (Draft) - S4254_2
Applied Research and Development of Tap Changer Maintenance Systems and Services: Modifications and Spares (Draft) - S4256_1
Battcon 2009 - S4259_1
(REVISED) Non Intrusive volatile gas analysis of oil filled switchgear (Draft) - S4262_1
Researching New Techniques for Optimising Battery Maintenance: Project Workshop