Module 4 - Substations projects for year
2001/ 2002
- S0455
(Final Stage) Surface preparation of live tanks - S0456
(Final Stage) Assessment of long term performance and suitability of type AC90 lubricant for use on circuit breaker high speed trip mechanisms - S0460
(Final Stage) Condition assessment of SF6 switchgear - S0463
(Final Stage) Insulation resistance field trials using the circular electrode system - S0463
(Final Stage) Insulation resistance field trials using the circular electrode system - S0473
Transformer insulation condition assessment techniques - S0474
(Final Stage) Trip and timing tests for 11 to 33kV circuit breaker - S0476
(Final Stage) Effect of environment on the performance of plant in substations - S0477
(Final Stage) Oil management in transformers, options for treatment and regeneration - S0478
(Final Stage) Design and simulation of high voltage earthing for pole mounted equipment in adverse conditions - S0482
(Final Stage) A review of post fault maintenance practices and research - S0485
(Final) The significance of differences in safety philosophy between the UK and Europe - S0485
(Final) The significance of differences in safety philosophy between the UK and Europe - S0487
Asbestos in electrical equipment and substations - S0491
(Interim Stage) Low cost thermal viewer for sub-station maintenance