Module 4 - Substations projects for year 2007/ 2008
- S4164_4
On-Load Tap Changer Monitor - Stage 4 - S4176_3
Substation Earthing Assessment and Inspection - S4181_2
Ongoing Programme Of Transformer Post Mortems (2007/08) - S4185_3
AM Forum Membership 07/08 - S4209_1
Post Maintenance testing - S4209_2
Post Maintenance Workshop - S4211_1
Management and use of actuators - S4212_1
Substation Maintenance Seminar - S4215_1
Internal Arc Requirements of New LV and HV SwitchgearThis document reviews internal arc type test criteria that are specified in various International and UK standards/specifications for LV, MV and HV switchgear. Current standards are often written around new switchgear with little or no consideration to existing substation build. Internal arc standards and specifications are critically reviewed and the main issue areas are highlighted. This should help Asset Owners and Network Operators when procuring new switchgear. Taking into consideration the material contained within this document should result in a safer substation environment with more reliable switchgear. Internal arc failures are described and the measures that can be adopted to mitigate the risks. - S4219_1
Battery Management - S4220_1
145kV Disconnector Asset Management Manual - S4221_1
Out of phase Workshop - S4222_1
Alternatives to ENATS 35-1 Transformers - S4223_1
Underground Substation Design - S4225_1
Assessment of BS148 and IEC60296 Insulating Oils - S4228_1
Alternative Measuring Techniques for Insulation Materials - S4234_1
Ferro Resonance Seminar