Module 4 - Substations projects for year
2008/ 2009
- S4164_5
On-Load Tap Changer Monitor (Stage 5) - S4164_6
Tapchanger monitor - Cost reconciliation - S4178_2
Impedance Testing of Substation Batteries - S4181_3
(Revised) Ongoing Programme of Transformer Post Mortems (08/09) - S4185_4
(Revised) AM Forum Membership 08/09: STP 4 Hosting Forum - S4185_5
Asset Managers Forum. (Reconciliation of Costs for attendance at AM Forum Executive Meeting: March 2008). - S4209_1
Post Maintenance Testing: Project Workshop Jan 09 - S4221_2
Out Of Phase Modelling Report (Draft) - S4222_2
Alternatives to ENATS 35-1 Transformers: Extension to cover 315KVA TRX - S4224_1
(Revised) X/R Extrapolation of 12KV Vacuum Circuit Breakers - S4226_1
(Revised) Environmental Corrosion, Specification, Testing of Plant & Equipment - S4230_1
Optimisation of Operational Support and Response for Electrical Plant & Equipment - S4233_1
145kV Earthing Switches Asset Management Manual - S4235_1
Researching New Techniques for Optimising Plant Maintenance Policies - S4236_1
Aquagen recombination system - S4237_1
Battery Cabinet Temperature Control - S4238_1
Module 4 Information Dissemination - S4239_1
Research and Testing of Electrical contact cleaning products - S4241_1
Study of Circuit Breaker Timing Measurements & Methods - S4244_1
Review of methods to dissipate pressure in Sub Stations during equipment failure - S4245_1
Switchgear - Effect of Low Power Factor Switching. (Joint Investigation with STP5: S5181_1). (Draft)