Module 4 - Substations projects for year
2011/ 2012
- S4181_7
Ongoing programme of transformer post mortems 2011-2012 - S4185_8
Developing Strategic Asset Management processes through technical liaisons with European Utilities - S4225_2
Technical evaluation of Revised BS148, Reclaimed Oils and Revised IEC60296 Unused Oils - S4243_2
Commissioning and Testing Procedures for HV Switchgear and Transformers from 33kV up to 132kV - S4255_2
Mechanical Strength of Transformer Paper Insulation: Verification of Tear Index Procedure - S4266_2
Analysis and Statistical Review of SF6 Gas Condition within Circuit Breakers in order to prolong Life: Further Analysis Work - S4268_1
Technical Evaluation of BS 5730 and IEC 604222: Insulating Oils in Service - S4269_2
Operational and Environmental Evaluation of SIPP Node Intelligent Bund Pump Technology: Additional Testing - S4273_1
Acoustic Fingerprinting of Circuit Breakers - S4276_1
Degradation on Composite Insulators and the Effects on Electrical Plant and Equipment: Researching Types and Specifications - S4277_1
Researching the suitability and benefits of Midel 7131 on on load tap changers - S4282_1
Non-intrusive Determination of Insulation Fluid Level in HV Chambers up to 132kV - S4283_1
Assessment of the Validity and Performance of On-Site SF6 Test Equipment - S4283_2
Assessment of the validity and performance of on site SF6 leak detection equipment - S4288_1
G59/2 Witness Testing: Guide for Commissioning Engineers - S4289_1
Substations for Wind and PV Farms