Module 5 - Networks for Distributed Energy Resources projects for year 2010/ 2011
- S5147_6
Microgenerator clusters - removal of equipmentMicrogenerator clusters - removal of equipment - S5167_2
Correlation of wind speeds over 1-20kmCorrelation of wind speeds over 1-20km - S5187_2
Participation in ENARD Annex IIParticipation in ENARD Annex II - S5189_2
Harmonic distortion caused by inverter connected distributed generationHarmonic distortion caused by inverter connected distributed generation - S5196_4
Transformer dynamic ratingsTransformer dynamic ratings - S5198_4
Microgrids - S5198_5
Microgrids - S5205_3
Fault level management (comparison of current approaches)Fault level management (comparison of current approaches) - S5205_4
Fault level management (through fault withstand)Fault level management (through fault withstand) - S5207_2
Long term domestic demands (spreadsheet)Long term domestic demands (spreadsheet) - S5209_1
Use of quadrature boosters on distribution networksUse of quadrature boosters on distribution networks - S5210_1
Use of capacitors for reactive power and voltage support on distribution networksUse of capacitors for reactive power and voltage support on distribution networks - S5212_2
SmartGrids (planning, workshop and specification)SmartGrids (planning, workshop and specification) - S5215_1
Latest developments in issues associated with low carbon networks - S5216_1
DSM - taking a passive approachDSM - taking a passive approach - S5217_1
DSM - taking an active approachDSM - taking an active approach - S5218_1
Review of DWG toolkitReview of DWG toolkit - S5219_1
Standardising the control and communications interface for DG connectionsStandardising the control and communications interface for DG connections - S5220_1
Impact of EVs on LV distribution networksImpact of EVs on LV distribution networks - S5222_1
Improving the accuracy of network losses measurementImproving the accuracy of network losses measurement - S5225_1
Connection of small generators to LV networks above the G83 capacity limitConnection of small generators to LV networks above the G83 capacity limit - S5234_1
The Effects of harmonic Distortion on Network Assets - S5235_1
Participate in the Revision of an Updated Flicker Curve (proposal to Cigre/Cired) - S5235_2
Participate in the Revision of an Updated Flicker Curve (Working Group)