Module 5 - Networks for Distributed Energy Resources projects for year
2008/ 2009
- S5147_8
Microgenerator clusters - Stage 8 - Extension of monitoring / analysis - S5151_5
Network risk modelling - technical basis for a revision of standards - S5161_2
Standard risk assessment approach to DNO protection (additional funds) (Draft) - S5167_1
Enhanced ratings for OHLs connecting wind turbines (additional funds) - S5169_1
Route plan to transform networks from passive to active networks - S5176_2
Impact of high penetration of microgeneration on cable ratings (Draft) - S5179_1
Developing a tool for modelling transient recovery voltage - S5181_1
Effect of low power factor switching - S5183_1
Communications - S5184_1
Methods for correcting demands for average conditions - S5187_1
Module 5 participation in ENARD Annex II DG System Integration - S5188_1
Latest developments in issues associated with low carbon network designs - S5188_2
Latest developments in issues associated with low carbon network designs - S5189_1
Techniques for assessing harmonic distortion from generation plant - S5190_1
Whispergen output characteristic monitoring - S5191_1
Lower cost connection solutions for DG and reinforcement projects - S5193_1
Fault level management - S5194_1
Investment Planning (PID preparation) - S5195_1
Network Losses (PID preparation) - S5196_1
Circuit Ratings (PID preparation) - S5196_2
Circuit Ratings - OHL dynamic rating model - S5196_3
Circuit Ratings - cable dynamic rating model - S5197_1
Power Quality Issues (PID preparation) - S5197_2
Power Quality Issues - S5198_1
Microgrids (PID preparation) - S5199_1
DG Connection automation tool validation - S5200_1
LV fuse reach urban / rural - S5201_1
DPCR5 - Network Losses Rewards - S5204_1
Monitoring of domestic heat pumps - S5205_1:
A Project Initiation Document (PID) for 'Fault Level Management' Large Project