Module 2 - Overhead Networks projects for year
2000/ 2001
- S0247
(Stage 2) Transmission of overhead line pictures from a helicopter to a control centre in emergencies - S0248
(Stage 3) GPS Pole position survey from helicopter - S0249
(Stages 2 & 3) Improved defect reporting during helicopter inspections - S0255
Detection of corroded stay rods - S0260
Detection of intermittent pin-insulator failure on 11kV lines - S0263
Cost-benefit assessment of supplementary wood-pole preservation techniques - S0264
Evaluation of polymeric pin/post insulators for overhead lines up to 33kV - S0265
Review of conductor greasing - S0266
Pole leakage current detector - S0271
Effect of HV lightning protection on level of lightning impulses at consumer premises - S0276
Lightning protection and earthing of pole mounted reclosers - S0277
Camera tracking system for aerial power line inspection - S0278
Cost effective lightning protection - S0364
Polymer degradation issues relevant to the electricity industry (joint with Module 3 and 4)