Module 2 - Overhead Networks projects for year
2004/ 2005
- S2112_1
Call-out Leakage Current Measurements on Suspect - S2114_2
Lightning risk map for overhead line equipment - S2119
Effect of lightning on insulated earth wires - S2120_1
Detection of Defective Surge Arresters - S2121
Tracking tests on new and old covered conductor samples from Finland and Sweden - S2122
Stage 1: Arc gaps and grading rings for long rod polymeric insulators for 132kV wood pole and tower lines a review of existing data - S2123
Involvement with Cigre WG11 2004-2005 - S2124
Vibration tests on new and old covered conductor samples from Finland and Sweden - S2125:
The Work of Cigre Study Committee B2 204/05 - S2127
WRAP seminar on treated wood waste - S2129/1
Suitability of latest composite poles for UK overhead electricity distribution lines - S2130_1
Leakage current measurements on poles with defective insulators