Module 2 - Overhead Networks projects for year
2002/ 2003
- S0266
(Stage 4 - Final) Pole leakage current detector - S0289
Tower life Issues to consider - S0290
(Final Stage) - OHL conductor heating a review of recent work - S0291
Ideas from Cigre - S0292
- Bird flight diverters on 132kV earth wires - S0293
Insulator RFI detector for helicopter - S0294
Risk of putting mobile phone aerials and antennae on wood pole lines - S0295
(Final stage) Risk of putting aerials/antennae on towers - S0296
Calibration checker for pole leakage current detector - S0297
(Stage 1)- Investigation of pole anomalies and weather effects with pole leakage current detector - S0298
Modifications to IMAGE software - S2100
(Final) - Performance of live-line taps - S2101(Final)
- Material Testing of the Hendrix HDPE 12kV/15kV Pin Insulator - S2102
(Final) - Optimising battery management for automatic overhead switchgear - S4115
(Joint Mod 2 & 4) (Final) Design and simulation of earthing arrangements to limit the potential gradients around hand operated, pole mounted equipment