Module 2 - Overhead Networks projects for year 2010/ 2011
- S2126_6
Monitor conductor temperature at fixed current - Stage 6: Pine and Hazel at same design temperature - S2160_2
Impedance testing of new and old poles - Stage 2: Test 9 more new poles - S2160_3
Impedance tests on wood poles - preliminary risk assessmentImpedance tests on wood poles - S2161_2
Site testing of load-lock anchors Stage 2: Testing Members' installations - S2162_1
Determination of residual strength of ageing wood poles - S2164_2
A Probabilistic wind and ice map for UK - Stage 2: Analyse model performances and develop proceduresA Probabilistic wind and ice map for UK - Stage 2 - S2169_1
Effect of wind turbines on wood pole lines: Stage 1: Extent and nature of downstream disturbance at wood pole height - S2171_1
Wedge clamps comparative tests - S2172_1
Analysis of Winter 2009/2010 data from Deadwater FellAnalysis of winter 2009/2010 data from deadwater fell