Module 2 - Overhead Networks projects for year
1998/ 1999
S0236 - Field and laboratory analysis of the performance of covered conductor fittings- S0220
- Develop model for conductor correction factors for use in line design under ET111 methodology - S0223
- Study to determine the feasibility of detecting defects in live overhead distribution insulators - S0226
- Alternative 11 and 33kV composite crossarms (Stage 1: establishment of the feasibility of introducing alternative composite cross-arms at 11 & 33kV in the UK) - S0227
- Inherently corrosion resistant aluminium overhead conductors - S0234
- Bird scarers for transmission towers - S0237
- Installation, monitoring and reporting of the performance of covered conductors installed at Deadwater Fell - S0239
- Preparation of project proposal on ET111 for STP - S0240
- Long span single circuit primary distribution overhead line design - S0243
- Alternative pole top configuration for distribution overhead lines - S0246
Lightning protection for covered conductor systems