Module 2 - Overhead Networks projects for year 2009/ 2010
- S2126_5:
Monitoring of conductor temperature at fixed current Stage 5: Set up two different-sized conductors at same design temperature - S2126_6:
Monitoring of conductor temperature at fixed current Stage 6: Monitor two different-sized conductors at same design temperature (Draft) - S2136_5
Measuring and forecasting atmospheric icing on structures - Stage 5: COST 727 in 2009 - S2139_2
Evaluation of a new corona discharge camera system - Stage 2: Field trials - S2154_3:
Experimental investigation of novel conductors at Deadwater Fell Stage 3: Repeat Vibration tests - S2156_2:
Pole leakage detector- Stage 2: Field trials in Member Companies - S2159_2:
Low Voltage shrouding - Stage 2: Development of performance criteria - S2160_1
Power frequency electrical withstand tests on new and used wood poles (Draft) - S2161_1
Site testing of load-lock anchors - S2164_1:
Produce a UK probabilistic wind/ice map Stage 1: Project Strategy and related interfaces - S2168_1
OHTEMP a spreadsheet to calculated conductor temperaturesOHTEMP a spreadsheet to calculated conductor temperatures