Module 2 - Overhead Networks projects for year
1999/ 2000
- S0220
- Develop model for conductor correction factors for use in line design under ET111 methodology - S0226
- Alternative 11 and 33kV composite crossarms (Stage 1: establishment of the feasibility of introducing alternative composite cross-arms at 11 & 33kV in the UK) - S0227
- Inherently corrosion resistant aluminium overhead conductors - S0229
- A brief comparison on RCM overhead line projects in Northern Electric and Seeboard - S0234
- Bird scarers for transmission towers - S0238
Vibration damping on covered conductor lines - S0243
- Alternative pole top configuration for distribution overhead lines - S0245
- RFI measurement of discharge activity on covered conductor systems - Stage 1 - S0247
- Transmission of overhead line pictures from a helicopter to a control centre in emergencies - S0248
- GPS pole position survey from helicopter - S0249
- Improved defect reporting during helicopter inspections - S0252
- Unstayed angle design for distribution OHLs - S0254
- Validation of criteria for continued use or replacement of wood poles - S0255
- Detection of corroded stay rods - S0258
- Entry into EU project on cost effective and reliable power transmission in harsh environments - S0260
- Detection of intermittent pin-insulator failure on 11kV lines