- S2126_3
Additional funding for S2126_3 due to underestimation, technical problems and delays - S2126_4
Monitoring of conductor temperature at fixed current Stage 4: Carry out at 2 sites - S2136_3
Continued involvement with COST 727 - S2138_2:
Investigation of live-line jumper-cutting limitations - S2140_2
A means of checking the foundations of newly installed poles: Stage 2 Field Trials - S2143_2
Develop in-situ degrad'n monitor for Al OHL conductors - Stage 2: Feasibility study - S2146_2
Torsion tests on composite insulators - Stage 2: Effect of torsion on tension insulators - S2148_1
Re-appraisal of ACE 104 methodology - S2150_1
Evaluation of TDR for assessment of tower foundations using SP data - S2151_1
Alternatives to wood poles - S2152_1
Evaluate performance of Czech Icemeter at Deadwater Fell - S2154_1
Experimental investigation of Ice loading of novel conductors - S2155_1
Comparison of available pole-top shrouds