Module 2 - Overhead Networks projects for year
2006/ 2007
- S2126_3
Additional funding for unexpected instrumentation costs - S2126_3
Monitoring of conductor temperature at fixed current Stage 3: Install monitoring at two locations - S2132_2
2nd winter's monitoring of ice accretion - S2136_2
Continued involvement with COST 727 - S2138_2
Investigation of live-line jumper-cutting limitations Stage 2: Carry out tests - S2138_2a
Investigation of live-line jumper-cutting limitations Stage 2a: Sorting venue for tests - S2138_2b
- Stage 2 additional funding to cover generator and UU costs - S2143_1
Develop in-situ degrad'n monitor for Al OHL conductors - Stage 1 underspend - S2143_1
Develop in-situ degradation monitor for Al OHL conductors - Stage 1: Review corrosion mechanism & monitoring techniques - S2144_1
Residual strength of tower fittings - S2145_1
Novel conductors for uprating tower lines - S2146_1
Torsion tests on composite tension insulators - S2147_1
Effect of multiple SVDs on vibration of new covered conductor types (revised price) - S2149_1
High durability OHL fittings Stage 1: Identify types of fittings and product research