Module 2 - Overhead Networks projects for year
2008/ 2009
- S2110_4
Extend OHRAT to include user-defined CC - S2136_4
Continued involvement with COST 727 for 2008/2009 - S2143_3
Corrosion monitor for aluminium OHL conductors ; Stage 3: Develop prototype (Draft) - S2144_1A
Residual strength of tower fittings (Draft) - S2147_2
Increasing vibration limit of CCs to 20%UTS using multiple standard or single Hi-mass SVDs - S2149_2
High durability OHL fittings - Stage 2: Costing for testing prototype high durability fitting - S2151_2
Alternatives to wood poles Stage 2: Erection and fitting trials on concrete poles - S2152_1
Evaluate performance of Czech Icemeter at Deadwater Fell (Draft) - S2153_1
Suitability of hand-held PD detector for condition assessment of pole-top equipment - S2154_2
Experimental investigation of novel conductors at Deadwater Fell Stage 2: Vibration - S2156_1
Build Three Prototype Field Pole Leakage Current Detectors - S2157_1
Novel conductors for 132kV wood pole lines - S2159_1
LV shrouding - review of current practices and standards