Module 2 - Overhead Networks projects for year 2011/ 2012
- S2126_7
Monitoring of conductor temperature Stage 7: Consistent analysis of data - S2160_4
Impedance of poles - Stage 4: Poles in ground - S2161_3
Site testing of load lock anchors Stage 3 - S2164_2
A probabilistic wind and ice map for UK - Stage 2 - S2164_3
A probabilistic wind and ice map for UK - S2172_1
Evaluating Winter 2009-2010 icing events at Deadwater Fell - S2174_1
Cigre WG B2.43 OHL Calculations - S2177_1
Vibration and ice load testing of fibre wrapped conductors at Deadwater FellS2177_1 Vibration and ice load testing of fibre wrapped conductors at Deadwater Fell