Module 2 - Overhead Networks projects for year
2003/ 2004
S0293_3 Commissioning prototype RFI detector for use on a helicopter- S2102_2
Optimising battery management for automatic overhead switchgear Stage 2: Battery management strategy - S2103
New Vibration limits for Overhead Lines - S2105
Criteria for overhead network end-of-life decisions - S2106
Condition based health indices as a basis for OHL replacement decisions - S2107
Work of CIGRE Study Committee B2 (Overhead Lines) 2003 Interim Report - S2107
Work of CIGRE Study Committee B2 (Overhead Lines): 2003 Final Report - S2108
Risk assessment for mobile phone antennae on DNO wood pole overhead lines - S2109
Dealing with electricity poles damaged by woodpeckers - S2110
A spreadsheet to calculate ratings for distribution OH conductors Stage 1: Single Circuit - S2110_2
Spreadsheet for distribution OH conductor ratings Stage 2: Multiple circuits and user-defined strandings - S2110_3
Spreadsheet for distribution OH conductor ratings Stage 3: Addition of Covered Conductors - S2111
(Final) - Approval of NNA for draft EN50XXX for UK wood pole lines below 45kV - S2112_1
Call-out Leakage Current Measurements on Suspect - S2113
(Final) Disposal options for treated wood poles - S2113
Tests on FCAP treated wood poles (addendum to report 5732 Disposal options for treated wood poles - S2115
The long term effects of industrial pollution on the performance of polymeric insulators within the UK - S2117
(Final) Report of WRAP/TRADA Wood recycling seminar