Module 3 - Cable Networks projects for year 2010/ 2011
- S3144_3
Oil cable treatment - analysis of cable (Draft) - S3161_2
Decision making tool for the assessment of long MV and HV cable circuits ; Stage 2: Create decision making tool (Draft) - S3165_2
Performance ageing tests on polymeric terminations: PD Measurements and U/V camera analysisPerformance ageing tests on polymeric terminations - S3173_1
Implications of climate change for cable systemsImplications of climate change for cable systems - S3176_2
Mechanical integrity of joints - Stage 2: testing of joints (Draft) - S3187_2
Polymeric sealants for cable ducts: protection of substations and basements against flood, fire and gas ingress (Draft) - S3190_1
Flushing of fluid filled cable circuits (Draft) - S3191_1
Pressure-volume curves for oil tanks (Draft) - S3192_1
Impregnation coefficients for fluid filled cables (Draft) - S3193_1
Reducing pressures in fluid filled cable circuits (Draft) - S3195_1
Researching alternative PU resins for jointing (Draft) - S3199_2
Developing an Automatic Update System for a Database of Fluid Filled Cables (Draft) - S3202_2
Performance evaluation of plastic smoothed walled and corrugated ducting installed in trefoil formation - S3223_1
Implementation of Security Method Developed to protect CRATER SpreadsheetsImplementation of Security Method Developed to protect CRATER Spreadsheets