- S3132_11:
CRATER for EHV single core polymeric cables (275kV and 400kV) - S3132_6
CRATER for MV Paper Cables - S3132_7
CRATER for cable crossings - S3132_9
CRATER for oil filled cables - S3140_1
Installation of ducted cable systems - S3140_2
Guidance for the installation of ducted cable systems - S3145_1
Reducing the shrink-back of PE sheath and insulation - S3146_1
Further testing of fire retarding coatings and tapes for cables - S3148_1,2
Requirements for earthing and bonding of single core MV power cables - S3149_1
Assessment of different HV polymeric cable designs (new proposal) - S3158_1
User specification for ducts - S3159_1