Module 1 - Improving Network Performance projects for year
2000/ 2001
- S0138
Effects of fault clearance times on customer quality of supply Stage 4: Voltage Clips - S0151
Connecting loads to existing HV and LV networks Stage 3 - S0152
Risk - Longer Term Research - S0153
Obtaining benefits from the connection of embedded generation - S0156
Measuring against normalised weather - S0159
Reshaping 11kV rural networks for reliable operation - S0160
World-wide review of 11kV urban network design - S0161
Robust method of costing the benefits of investment - S0162
Optimum investment strategy for minimising fault rates - S0163
Protection co-ordination